Cedar River Corporate Park
Renton, Washington
Paul McCormick was the Principal in Charge working for Tarragon Development Company for this redeveloped "Brown Site" in Renton, Washington.
The site included a wetland stream and high groundwater levels and required the use of a pumped storm water system. This was a unique design never before allowed in the city of Renton, but Paul's negotiations with the city were successful to allow use of this system, which resulted in placement of this modern business park on the property.
The park was designed as a contemporary pedestrian friendly park, utilizing outside open spaces for tenants to use for taking personal time away from work. The site includes 4 separate buildings designed as flexible retail/business space. The project was designed in 2007 while Paul was CEO of AHBL, and built in 2008.
|